Workplace Charging Point Installation in Burnley

Workplace charging point installation in Burnley for staff and visitor parking. Most sites need several units, load management and a record of who used what. We survey the supply, install and certificate.

Planning Around the Working Day

Cars sit in a workplace car park for hours, so slow steady charging suits it better than expensive rapid units. Several 7kW points usually serve more people than one fast one. We look at how long vehicles stay and how many need charging before recommending anything.

More Information

Sharing the Supply Between Points

Load management lets several chargers share the power a building can spare, turning each one down slightly rather than tripping the main fuse. It means more points on the same supply without an expensive upgrade. Most workplace systems we fit use it.

Staff Access and Usage Reporting

Access is normally set with an RFID card or an app account per employee. That keeps the points for staff and gives you a report of energy used per person, which matters for benefit in kind records and for recharging fleet costs. We set the accounts up with you.

About us

JD Electrical Services installs workplace charging points for businesses around Burnley and across Lancashire. We have been trading for 10 years and handle the supply survey, the cable routes, the install and the certification. Work can run outside office hours, as we cover 6am to 11pm seven days a week.

  • Approved electricians with 10 years behind us

  • Open 6am to 11pm, seven days a week

  • Emergency call outs available 24 hours a day

  • Price agreed in writing before work starts

  • Certificate issued at the end of every job

STILL NOT SURE?

Frequently Asked Questions

How many workplace charging points do we need?

A sensible starting point is one for every two or three electric vehicles on site, since cars are parked all day and do not all need a full charge. It is far cheaper to lay ducting for future points now than to dig the car park twice. We size it with you.

Can we install charging points on a leased building?

Usually, but you will need the landlord's written consent first, as the work affects the building and often the car park surface. We can provide the drawings and the scope so you have something to put in front of them. Get the consent before booking the install.

How long does workplace charging point installation take?

The survey takes a morning. The install runs from one day for a couple of wall mounted units close to the board, up to a week or more where trenching and ducting cross a car park. The groundwork, not the chargers, sets the timescale.

Our reviews